Image from Google Jackets

Project management : a managerial approach / Jack R. Meredith, Samuel J. Mantel, Jr.

By: Contributor(s): Material type: TextTextPublication details: New York : Wiley, c1995.Edition: 3rd edDescription: xvi, 767 p. : ill. (some col.), col. maps ; 25 cmISBN:
  • 9781119586081
  • 0471016268 (acidfree paper)
Subject(s): DDC classification:
  • 658.4/04 20
LOC classification:
  • HD69.P75 M47 1995
Contents:
Ch. 1. Projects in Contemporary Organizations -- Pt. I. Project Initiation. Ch. 2. Project Selection. Ch. 3. The Project Manager. Ch. 4. Project Organization. Ch. 5. Project Planning. Ch. 6. Negotiation and Conflict Resolution -- Pt. II. Project Implementation. Ch. 7. Budgeting and Cost Estimation. Ch. 8. Scheduling. Ch. 9. Resource Allocation. Ch. 10. Monitoring and Information Systems. Ch. 11. Project Control -- Pt. III. Project Termination, Multicultural Projects, and Unsolved Problems. Ch. 12. Project Auditing. Ch. 13. Project Termination. Ch. 14. Multicultural, Environmental, and Unsolved Issues. Appendix A / Creativity and Idea Generation -- Appendix B / Technological Forecasting -- Appendix C / The Normal Probability Distribution -- Appendix D / Matrix Multiplication -- Appendix E / Probability and Statistics.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Books in General collection Books in General collection Mzuzu University Library and Learning Resources Centre Non-fiction HD 69.P75 MER 1995 (Browse shelf(Opens below)) 7430 Available MzULM-007430

Includes bibliographical references and indexes.

Ch. 1. Projects in Contemporary Organizations -- Pt. I. Project Initiation. Ch. 2. Project Selection. Ch. 3. The Project Manager. Ch. 4. Project Organization. Ch. 5. Project Planning. Ch. 6. Negotiation and Conflict Resolution -- Pt. II. Project Implementation. Ch. 7. Budgeting and Cost Estimation. Ch. 8. Scheduling. Ch. 9. Resource Allocation. Ch. 10. Monitoring and Information Systems. Ch. 11. Project Control -- Pt. III. Project Termination, Multicultural Projects, and Unsolved Problems. Ch. 12. Project Auditing. Ch. 13. Project Termination. Ch. 14. Multicultural, Environmental, and Unsolved Issues. Appendix A / Creativity and Idea Generation -- Appendix B / Technological Forecasting -- Appendix C / The Normal Probability Distribution -- Appendix D / Matrix Multiplication -- Appendix E / Probability and Statistics.

There are no comments on this title.

to post a comment.

Powered by Koha